Candidate Questionnaires
We sent questions to every candidate in each of the 2026 races listed below. These offices make decisions about development and utilities that directly affect Effingham County and the surrounding areas.
How This Survey Works
On October 5, we emailed a questionnaire to every candidate for county commission, Georgia House, Georgia Senate, and the Public Service Commission. We used the contact information each candidate listed publicly.
On October 15, every candidate received the same reminder with the questions included again. The deadline was 8pm on October 19 for everyone. Every answer is posted exactly as submitted. If a candidate didn’t share a response, “No response received as of Oct 19” will appear by their name.
If a candidate sends answers after the deadline, we’ll add them with the date received.
Questions about this process? Email info@protecteffingham.org.
Click on each race to see their questions:
Effingham County Commission Race
(Candidates are listed in alphabetical order by last name.)
DISTRICT 2
-
Darlene Ainsworth
“The main benefit of the proposed large data center could be financial gain for Effingham County. The main risk of the proposed large data center is the quality of life of every living thing in Effingham County.”
Roger Burdette
No response received as of Oct 19.
-
Darlene Ainsworth
“Yes
Far enough in advance that the public can have meaningful input into and understanding of the decision-making. I prefer that these large projects require conditional use permits, so the BOC can debate the permitting publicly.”
Roger Burdette
No response received as of Oct 19.
-
Darlene Ainsworth
“Yes
Effingham County's only local control over the IDA is who it appoints to the IDA. If that is the only control, the Commissioners need to choose well and be ready to be held accountable for the IDA's decisions. They appointed them. They're responsible.”
Roger Burdette
No response received as of Oct 19.
-
Darlene Ainsworth
“Data centers (and other large industrial projects with potential external negative effects that reach beyond their property boundaries) should be allowed only through conditional use with public hearings.
Yes, I support a temporary pause until the BOC writes new ordinances.”
Roger Burdette
No response received as of Oct 19.
-
Darlene Ainsworth
“Require hydrology studies for warehouse and industrial development.”
Roger Burdette
No response received as of Oct 19.
-
Darlene Ainsworth
“Level of service standards are already a part of our process (although 20 years old). I suggest we relook at those.
With the current system, the county can either validate the claim, or hire somebody for their opinion on the matter.”
Roger Burdette
No response received as of Oct 19.
-
Darlene Ainsworth
“Property tax abatements or payment-in-lieu-of-tax agreements can be appropriate to encourage desired development.
In all cases where PILOT is used, the agreement should include milestones on a timeline for jobs created and other promises. If those milestones are not met, the agreement should include rigorous claw-back provisions”
Roger Burdette
No response received as of Oct 19.
-
Darlene Ainsworth
“Yes
I don't believe the county can/should sustain that relief absent sufficient payments. The relief is designed to take advantage of "overages". If "overages" are there, great! If "overages" aren't there, they aren't there. The county needs to be ready to defend either situation. The public also needs to understand it isn't guaranteed.”
Roger Burdette
No response received as of Oct 19.
-
Darlene Ainsworth
“I primarily want to attract more businesses that serve the residents that densely populate District 2. Restaurants/Retail/Entertainment establishments can keep money in Effingham instead of sending it to Chatham County. I think those establishments should pay for the road improvements required to operate their business, such as turn lanes, traffic lanes, etc.
I'm also favorable to manufacturing development in current industrial areas (only). Applicants for those enterprises need to be prepared to pay for any required infrastructure improvements, fund an appropriate monitoring program to ensure the safety of nearby residents, and provide a fund to mitigate any harms.”Roger Burdette
No response received as of Oct 19.
-
Darlene Ainsworth
“The decision to update the Table of Permitted Uses in-house was inexpensive (or very expensive, depending on how you measure it). The county is currently trying to hire a consulting firm to update our zoning regs. This is a better decision.”
Roger Burdette
No response received as of Oct 19.
DISTRICT 3
-
Jamie Deloach
No response received as of Oct 19.
Scott Hoffman
“There are no benefits to an AI data center. They steal and scrub the world's knowledge and re-sell it to us like it's a utility. They devour enormous resources to operate, with very little employment after construction. Before supporting one, I want ordinances in place for light and sound pollution, on site generator usage, guaranteed number of jobs and no tax abatements. Should any of the conditions get breached there would be severe financial penalties up to and including forced ceasing of operations.”
-
Jamie Deloach
No response received as of Oct 19.
Scott Hoffman
“Absolutely. If there is even a whisper of something that could drastically affect any community it should be brought to the public's attention. These considerations should be mentioned publicly in BOC meetings with appropriate notice on agendas.”
-
Jamie Deloach
No response received as of Oct 19.
Scott Hoffman
“Yes, the commissioners should thoroughly vet any appointees to ensure the prospective appointee’s goals align with the community’s needs. The ECIDA should give monthly updates to the commissioners and the public so they have visibility of the goings on in the IDA and what may be in the pipeline.”
-
Jamie Deloach
No response received as of Oct 19.
Scott Hoffman
“They should be conditional use with review periods allowing for public comment. Impacts of the magnitude that data centers create should have a larger discussion with no back room dealings, or smoke and mirrors. Yes, I would support a moratorium on data centers.”
-
Jamie Deloach
No response received as of Oct 19.
Scott Hoffman
“I would support a review of the current industrial zone permitted use tables by the planning committee and board of commissioners. Projects with significant potential impact should not be included in permitted uses. Projects that should be conditional use (like an AI data center) or requests for re-zoning should require environmental impact studies and follow public comment periods.
The commissioners should consider prior re-zoning and development approvals before any action. Projects that have been approved, but have not yet started construction or not completed should be included in any impact studies for new requests to ensure we understand the full scope.”
-
Jamie Deloach
No response received as of Oct 19.
Scott Hoffman
“Effingham County should at minimum use the standards set by the State of Georgia (e.g Georgia Environmental Protection Division and Georgia Department of Transportation). Project impact reports should be fully and properly submitted to the Coastal Regional Commission. For projects impeding on identified wetlands, the Army Corps of Engineers should be consulted as required.
Beyond the state agencies, the county should include public comment periods to allow for other conservation agencies or interested parties to review project impacts to the environment.
The board of commissioners and county manager should work closely with the leaders of our emergency services and school district to assess their needs.”
-
Jamie Deloach
No response received as of Oct 19.
Scott Hoffman
“They should be focused on growing small businesses. This way the money stays in the county.
If Effingham is so desirable of a place to do business why should we give abatements/PILOTs to companies that can afford to pay their way and in doing so pass the tax burden onto the county residents? If credits are given to large companies there should be clear requirements for employment numbers or investment promises. If they are not met severe penalties/fines are assessed.”
-
Jamie Deloach
No response received as of Oct 19.
Scott Hoffman
“No. LHOST will give relief to homestead property owners, but the tax will be pushed to a sales tax. The tax is just moving somewhere else under the mask of “savings”. Renters will bear more of the burden as they won’t see any property tax savings, just higher sales taxes. Property tax savings should come from lowered millage rates when property values increase.
This is the whole problem with this proposal. If this “large tax payer” payment is lower or later than expected there could be no homestead savings. It’s gambling on an enormous “if”. If there is not enough money in the fund to cover the homestead property tax collections, the county could revert to normal property taxes.”
-
Jamie Deloach
No response received as of Oct 19.
Scott Hoffman
“I want to attract more locally owned and operated businesses. Local businesses reinvest in the county economy by hiring local employees and using local service providers. National studies show that nearly 70% of dollars spent at local businesses are recirculated in the community.”
-
Jamie Deloach
No response received as of Oct 19.
Scott Hoffman
“I would have limited the amount of warehouse growth and tried to focus on more job dense industries where the employee per sqft is more reasonable.”
DISTRICT 5
-
James Daniels (write-in) (Received on Oct 27)
“The benefits are real. A data center can bring a big tax payment, good-paying jobs and money for our schools.
The risks are just as real: water, power, noise, wetlands, and what happens if the company doesn't deliver. The handouts promised 1,000 jobs, an $80 million community fund, closed-loop cooling, no groundwater wells, 300-foot buffers and yearly audits. The signed agreement calls for 400 jobs, and the company could fill 60 percent and owe nothing if it meets its investment target. None of the rest is in it. Promises without teeth mean nothing.
There's also the risk it never gets finished. These companies are spending more than they bring in, and some of OpenAI's biggest partners have had their credit downgraded this year. The agreement allows up to 24 months of delays. If the money dries up after the first building, we could be left with a half-built campus and the roads, lines and promises that came with it.
And there's the risk of what comes later. Today the plans show only backup generators. But natural gas power plants are already allowed by right in the same industrial zoning, and data center companies around the country are now looking at putting small nuclear reactors on site. That kind of decision should be made in public, before it ever comes up, not after.
These protections should be in writing before any project like this is approved.
An independent water study, a hard cap on use, no wells in the Floridan aquifer, and a yearly public report.
Residents never pay for the substations and power lines built to serve it, and no one is forced to give up land for them.
Measured noise limits at the property line, including low-frequency hum, with monitoring and penalties big enough that it never makes sense to just pay them.
Real buffers from homes and schools, including Creekside Elementary, which touches the site, and Blandford Elementary, less than a mile away.
Shielded lighting so neighborhoods aren't lit up all night, wildlife-safe fencing, and construction traffic kept off school routes.
No power generation on site beyond backup generators, gas or nuclear, without its own public hearing and vote.
Tax breaks only on what's actually built and running, phase by phase.
Jobs for locals, clawbacks with teeth if jobs fall short, and a decommissioning bond so taxpayers never pay to clean up an empty building.”
N. Phillip Kieffer
No responses received as of Oct 19.
-
James Daniels (write-in) (Received on Oct 27)
“Yes.
People aren't against growth. They're against finding out after it's done. The IDA approved this deal on an agenda that said "Project Gateway," with no buyer, no price and no acreage.
Here's what I'd want:
Two plain-English sentences on every agenda item and notice, saying what it is, where it is, what it changes and what it costs. No codenames on a public agenda.
Full contracts posted seven days before any vote, whether it's the county or the IDA voting.
Public comment before every vote, whenever someone is there to speak.
Both public hearings, Planning Board and Board of Commissioners, for anything that changes what can be built.
A town hall in the district it affects, before the vote, not after.
Companies can still keep trade secrets. But the public should know who, where, how big and what the county is giving up before it's signed.”
N. Phillip Kieffer
No response received as of Oct 19.
-
James Daniels (write-in) (Received on Oct 27)
“Yes.
The commission appoints most of the IDA board, so voters should be able to hold commissioners responsible for who they put there. Right now the IDA's 2 mills are written into a 1968 constitutional amendment, with no millage hearing, and it took in hundreds of millions of dollars from a land sale. That's a lot of power with very little public check.
What I'd push for:
IDA board seats opened to public applications, with interviews. Several seats are open or up at the end of this year.
Anyone with a business, family or board tie to a deal steps out of the room.
A monthly report from the IDA to the commission on what it's working on, who it's talking to and who it's working with. A company's name doesn't have to go public early, but the commission should at least know who it is, and the public should know what kind of project it is and where.
A yearly public report on every deal, every dollar and every promise kept or missed.
Asking our state delegation for a local law requiring commission approval before big tax breaks, and public notice before IDA votes. Effingham has done this before: in 2007 a local law made the IDA follow county zoning.”
N. Phillip Kieffer
No response received as of Oct 19.
-
James Daniels (write-in) (Received on Oct 27)
“Conditional use with a public hearing. And yes, I'd support a temporary pause.
A project this size should never be by right. Conditional use doesn't mean no. It means the commission has full control over whether it goes in and on what terms, after the public is heard. When the use table changed in December 2025, data centers became permitted by right in two industrial districts, and that control was gone.
It shouldn't stop at data centers. Any building over a set size, in any category, should automatically be a conditional use. A warehouse, a data center or anything else that big affects roads, water and neighbors the same way, and it should get the same public hearing.
A temporary pause gives the county time to write real standards for noise, water, power, buffers and cleanup.
Georgia courts have allowed temporary moratoriums like this. Bulloch County has one in place right now. A pause won't undo projects that already have their rights locked in, so it needs to happen soon.”
N. Phillip Kieffer
No response received as of Oct 19.
-
James Daniels (write-in) (Received on Oct 27)
“We've approved a lot of warehouse space on land near wetlands and in floodplains, and people downstream feel it every time it rains.
First, large sections of land shouldn't be rezoned for industry until we use up what we already have. The county already has about 14,000 acres zoned I-1. We should stop creating new industrial districts and leave industry where it is. Too much industrial pushes residents away.
What I'd change in the review itself:
Drainage and stormwater studies before approval, reviewed by an engineer the county hires, not just the developer's.
Look at the whole watershed, not one project at a time. Ten "small" impacts add up.
No fill in the floodplain without making up the storage somewhere else.
Tell the public up front if a project needs a wetlands permit. Camellia alone would fill about 72 acres of wetlands, and the Army Corps notice for that only came out this month, long after the deal was signed.
Bigger natural buffers along creeks and wetlands.”
N. Phillip Kieffer
No response received as of Oct 19.
-
James Daniels (write-in) (Received on Oct 27)
”Infrastructure ready first. Roads first, rooftops second.
The standard should be simple: if the roads, water, sewer, fire, EMS and schools can't handle it on the day it opens, the timing waits or the developer pays for what's needed.
Roads: a traffic study showing the roads still work at peak hours.
Water and sewer: written proof of capacity from the utility, for this project plus what's already approved.
Fire and EMS: response times stay where they are, or the project pays to fix them.
Schools: a capacity letter from the school system.
Who verifies: an independent engineer or consultant hired by the county and paid from application fees, not the applicant's own consultant. The findings should be public before the vote.”
N. Phillip Kieffer
No response received as of Oct 19.
-
James Daniels (write-in) (Received on Oct 27)
“A tax break is fair only when the county comes out ahead after counting the costs: real local jobs at good wages, and the infrastructure paid for. If it can't pass that test in writing, it shouldn't happen.
What it should require:
Jobs measured on their own. The OpenAI agreement lets a company fill only 60 percent of the promised jobs and still count as meeting its goal, as long as it hits its spending number.
Clawbacks with teeth. Missing a goal should cost more than just paying a fee.
Tax breaks only on what's actually built and running, phase by phase.
A yearly public audit of jobs, wages and investment.
Local hiring and local contractors where possible.
A decommissioning bond, so taxpayers never pay to tear down an empty building.”
N. Phillip Kieffer
No response received as of Oct 19.
-
James Daniels (write-in) (Received on Oct 27)
”Yes, with my eyes open.
I support the goal of Project Zero. But school taxes, most of the bill, stay, and the IDA's $30 million a year lasts three years. This program was passed at the state level, so this vote is us adopting it. In years the county has a surplus, part of that money goes back as a credit on homestead tax bills, county taxes only, not school taxes. It doesn't raise anyone's taxes. But there's no set amount, it only happens if there's a surplus, and the state still hasn't released the rules for how it works.
To make relief last while funding the basics, I'd push for these.
Public safety, roads and drainage funded first.
Never build the budget on one taxpayer's projected payments. Count the money when it arrives.
An independent, outside forensic audit of where the money has gone the last few years, including cost overruns.
A public budget for year four and beyond, before the IDA money runs out.
A reserve fund for bad years, so we don't get an unexpected property tax hike.
Impact fees, so growth pays for the roads and services it needs, not us.”
N. Phillip Kieffer
No response received as of Oct 19.
-
James Daniels (write-in) (Received on Oct 27)
“I want jobs that let people work where they live. More than 20,000 of our residents leave the county for work every day.
That means employers that grow here, skilled manufacturing and trades, and local businesses that have served this area for years.
Every project should be judged first on one thing. Is it good for the quality of life of everyone in this county?
Then I'd ask these questions.
Does it create meaningful jobs for locals?
What does it do to our environment?
Does it support local business, with subcontract and maintenance work going to companies here?
Is it sustainable, and does it pay its own way? Roads, water, drainage, fire and EMS have to be ready first, and if they're not, the developer pays for the infrastructure it needs.
And every promise goes in the contract, with clawbacks if they fall short.
Our location next to the port, rail and interstates gives us value. We can be picky.”
N. Phillip Kieffer
No response received as of Oct 19.
-
James Daniels (write-in) (Received on Oct 27)
“The December 2025 change to the use table that made data centers a permitted use in industrial districts.
In October 2025, Georgia Power briefed all six commissioners on data centers. Two months later the board approved a use table that added the I-1 district and made data centers permitted by right there. The board was told I-1 would mirror heavy industrial. Data centers were never mentioned, there was no public comment, and no discussion is recorded.
I would have made data centers a conditional use with a public hearing. That one change would have give the commission and the public a real say in Project Camellia before it was decided, instead of after.”
N. Phillip Kieffer
No response received as of Oct 19.
GA State Senate Race
(Candidates are listed in alphabetical order by last name.)
DISTRICT 4
Billy Hickman: No response received as of Oct 19. (candidate is running unopposed)
GA House of Representatives Race
(Candidates are listed in alphabetical order by last name.)
DISTRICT 159
Jon G. Burns: No response received as of Oct 19. (candidate is running unopposed)
DISTRICT 161
-
David Dillie
“YES
Absolutely. Industrial development authorities should answer to the people they serve. I would support legislation giving local governments more oversight and allowing communities to restructure or dissolve these authorities through a proper legal process. Taxpayers deserve transparency and accountability.”
Bill Hitchens
No response received as of Oct 19.
-
David Dillie
“YES
I would support requiring 90 days’ public notice for projects worth $25 million or more, or involving at least $1 million in public incentives, along with a public hearing and 30 days for public comments.
Folks shouldn’t find out about massive developments in their backyard after the deals have already been signed.”
Bill Hitchens
No response received as of Oct 19.
-
David Dillie
“END IT FOR NEW PROJECTS
I’m not against technology or economic development, but I am against giving billion-dollar corporations tax breaks while hardworking Georgians struggle to pay their bills.
These companies should pay their fair share. I’d rather see those tax dollars support education, infrastructure, skilled trades, and small businesses.”
Bill Hitchens
No response received as of Oct 19.
-
David Dillie
“REQUIRE PUBLIC OVERSIGHT
Major power contracts should require public hearings, independent reviews, and a vote by the Public Service Commission.
We also need protections ensuring residential customers aren’t paying for infrastructure built specifically for these developments.
Georgia families shouldn’t have to foot the bill for billion-dollar corporations.”
Bill Hitchens
No response received as of Oct 19.
-
David Dillie
“BOTH
Georgia needs statewide standards protecting our water, environment, farmland, and communities. However, local governments should have the final say and the ability to establish stronger protections.
I’ve supported a statewide moratorium on large-scale data centers until we fully understand their impacts.
Once our farmland is gone, we aren’t getting it back.”
Bill Hitchens
No response received as of Oct 19.
-
David Dillie
“YES
Absolutely. We shouldn’t rely entirely on numbers provided by the companies seeking approval.
I would support independent studies of water usage, traffic, electrical demand, and environmental impacts. Developers should pay for these studies, but the results must remain independent and available to the public.”
Bill Hitchens
No response received as of Oct 19.
-
David Dillie
“STRONGER ACCOUNTABILITY
I support stronger financial disclosure requirements and mandatory recusal when legislators have a direct personal financial conflict of interest.
Nobody should be using public office to line their own pockets. Democrat or Republican, everyone should be held to the same standard.”
Bill Hitchens
No response received as of Oct 19.
-
David Dillie
“As a welder, pipefitter, plumber, and aircraft mechanic, I believe in bringing good-paying, skilled jobs to coastal Georgia.
I want to see more manufacturing, aerospace, agriculture, and small businesses. Companies receiving taxpayer incentives should provide local jobs, workforce training, environmental protections, and infrastructure investments.
Growth is good, but it needs to benefit the folks who already call Georgia home.”
Bill Hitchens
No response received as of Oct 19.
-
David Dillie
“INTRODUCE A DATA CENTER MORATORIUM
One of my first priorities would be introducing legislation establishing a temporary statewide moratorium on new large-scale data center approvals until independent environmental, water, and infrastructure studies are completed.
I’ve been fighting for transparency surrounding Project Camellia, and I’ll continue that fight in Atlanta.
I’m not against Georgia growing. I just want to make sure our children and grandchildren still recognize the communities we call home.”
Bill Hitchens
No response received as of Oct 19.
Public Service Commission (PSC) Race
(Candidates are listed in alphabetical order by last name.)
DISTRICT 3
-
Peter Hubbard
“Project Camellia is 32 times the large load contract threshold of 100 MW. It will require tens of billions of dollars in new power plant and transmission line investment to provide it with electrical service. As such, it and other large load contracts should require a vote from elected commissioners at the end of a 3-month review period with intervenor participation. Current PSC rules for large load contracts are insufficient to protect consumers and fully rely on Georgia Power's discretion to negotiate bespoke terms. The rules should be revised to require disclosure of the expected cost to serve, including both embedded costs from existing infrastructure and the incremental costs from new power plants and transmission lines triggered by the customer. Other disclosures should include the expected carbon emissions as a result of serving the large load customer.”
Fitz Johnson
No response received as of Oct 19.
-
Peter Hubbard
“Public disclosure of large load contracts should follow best practices for preserving the narrative context of the consumer protections that were negotiated into the contract terms while protecting potentially trade secret information. The reality is that Georgia Power competes with EMCs and utilities in other states for data centers business, so unredacted would not work. But full contract terms for large load customers should be made available to formal intervenors in a 3-month review period, which is not required in current PSC rules.”
Fitz Johnson
No response received as of Oct 19.
-
Peter Hubbard
“The overwhelming reason that new power plants and transmission lines are being built in Georgia is to serve data centers. Therefore, they should pay the overwhelming majority of the costs of the incremental buildout that they are triggering, plus a fair allocation of the embedded costs of interconnecting to the existing power grid. Additional protections are required under current PSC rules (including longer contract terms to align with long-term investments, parent guarantees, minimum monthly take-or-pay fee, and an early termination fee) albeit with full discretion given to Georgia Power to negotiate those terms. The fact that there is an early termination fee means that contracts can be terminated early, so further mitigating actions are needed. These measures include retiring uneconomic coal plants that are currently being extended another decade for data centers, and disallowing recovery of surplus generation and transmission capacity so that shareholders eat the surplus costs, not ratepayers.”
Fitz Johnson
No response received as of Oct 19.
-
Peter Hubbard
“It is important to pay attention to the language from Georgia Power, who pledged to structure the next rate adjustment in 2028 to put $15 of “downward pressure” on the average residential customer’s monthly bills. "Downward pressure" means that bills will be $15 lower than they otherwise would be, but the savings may be offset by upward pressure on bills from higher fuel costs and when the new power plants and transmission lines are built and Georgia Power can add them into the electric rates. Also, this pledge only applied to the years 2029-2031 and is for future benefits in exchange for incurring costs today to build new power plants and transmission lines for data centers. The PSC cannot guarantee that large load customers will fulfill their long-term contracts and produce the anticiapted revenues, and if revenues fall short then it will be up to the PSC to ensure that Georgia Power eats the costs of the surplus investment, not ratepayers.”
Fitz Johnson
No response received as of Oct 19.
-
Peter Hubbard
“Large load customers already undergo a detailed techincal review of the upgrades needed to interconnect to the high voltage transmission grid. The PSC can ensure that these new large load customers do not harm reliability by measuring the historical performance of the grid in terms of reliability (number of customer interruptions and the duration) and providing an incentive to improve and a disincentive for worsening performance. Data centers could also choose to invest in local grid resilience by deploying solar and battery projects in neighboring communities, although this would be a volunteer effort from the data center and not necessarily originate from the PSC.”
Fitz Johnson
No response received as of Oct 19.
-
Peter Hubbard
“The Georgia PSC should incorporate the full cost of new power plants, including the social cost of emitting climate changing carbon dioxide and methane as well as the public health costs of combusting coal and methane and the associated asthma, pre-mature births, etc., when deciding whether to authorize new generation. When the rest of the United States and world are building 90% of new power plants using solar, wind, and batteries, it becomes apparent that there is a disconnect with Georgia Power who requested and received certification in December 2025 (weeks before newly elected commissioners would join the PSC) for new power plants that were 60% fossil gas-fired and 40% battery. The constant purchase of fossil fuel is the largest costs of operating gas-fired and coal-fired power plants, whereas solar and wind do not have fuel costs or transportation costs from pipelines and railcar deliveries.”
Fitz Johnson
No response received as of Oct 19.
-
Peter Hubbard
“Data center companies are among the wealthiest in the world, and could be asked to contribute more than their fair share to the cost to serve their electrical requirements. That surplus could be used to improve grid reliability and fund the transition to clean energy. Instead, Georgia Power is using this as an opportunity to build new fossil fuel power plants and new transmission lines that will lock Georgia into higher power bills and more costs from climate change in the future. Early in 2026, Georgia Power asked the PSC to recover $912 million in storm costs, mostly from Hurrican Helene whose intensity was 11% stronger in terms of wind speed as a result of man-made climate change. These costs are real and they are increasing. The PSC should determine if the costs incurred today and in the future outweigh the potential benefits if data center revenues appear as advertised.”
Fitz Johnson
No response received as of Oct 19.
-
Peter Hubbard
“As a commissioner, I stopped the automatic approval of Project Camellia and provided Staff both the time (just 12 additional days) and the leverage to ask more of Georgia Power in terms of consumer protections. I did not have the votes to go further and require a longer review process including formal intervenors, but I did help to extract further concessions from Georgia Power. That promise of future benefit is only as good as a PSC that holds Georgia Power to its pledge, and the PSC need to enact further rules to protect consumers, which I intend to do in 2027.”
Fitz Johnson
No response received as of Oct 19.
DISTRICT 5
-
Shelia Edwards
“Yes.”
Josh Tolbert (Received on Oct 21)
“Yes. Contracts of this size can create decades of financial obligations and affect electricity costs throughout Georgia. Elected commissioners should vote publicly after a thorough technical and financial review, with an opportunity for public input. Staff analysis is essential, but commissioners should take responsibility for decisions with consequences this significant. I would require a clear demonstration that the contract covers the customer’s direct and indirect costs, protects existing customers if projected demand fails to materialize, and maintains reliable service.”
-
Shelia Edwards
“I believe the public has a right to know whether large corporations, including data centers, are paying their fair share of the electricity infrastructure they require. The public should have access to essential contract terms, including projected electricity demand, infrastructure costs, ratepayer protections, minimum payment commitments, contract duration, and provisions addressing what happens if a large customer reduces operations or leaves Georgia. Formal intervenors should have access to the complete contracts under appropriate confidentiality agreements or protective orders so they can independently evaluate whether the arrangements protect consumers. Legitimate trade secrets should be narrowly limited to information whose disclosure would cause demonstrable competitive harm. Contract terms that determine who pays for electricity infrastructure cannot be hidden simply because a utility or corporation labels them confidential. I will push for independent scrutiny, meaningful public disclosure, and Commission votes on major contracts. My guiding principle is straightforward: Who pays? Who profits? And who is protecting Georgia's ratepayers? The Public Service Commission must answer those questions before approving agreements that could leave Georgia families paying for decades.”
Josh Tolbert (Received on Oct 21)
“The public should be able to understand what is being promised, who bears the financial risk, and how existing customers are protected. Contract duration, cost-allocation methods, minimum payment obligations, termination protections, and projected ratepayer benefits should be disclosed as fully as possible.
Qualified intervenors and their experts should have access to the full terms needed to evaluate those protections, subject to appropriate confidentiality agreements and protective orders. Trade-secret protection should require a specific, demonstrated justification and narrowly tailored redactions. It should not become a blanket exemption that prevents meaningful scrutiny of obligations affecting customers’ bills.”
-
Shelia Edwards
“As Commissioner, I will vote for data centers to pay their own way—not Georgia families. Georgia families should never be forced to pay for power plants, transmission lines, or other infrastructure built to serve data centers if that projected demand never materializes. The PSC must require binding, enforceable financial commitments from large-load customers before approving major infrastructure investments on their behalf. These protections should include minimum payment obligations, take-or-pay contracts, substantial financial guarantees, and exit penalties that prevent companies from walking away and leaving residential customers with the bill. I would also require independent verification of projected electricity demand, phased infrastructure development tied to actual customer commitments, and transparent accounting that separates data center costs from residential ratepayer obligations. Most importantly, the financial risk of speculative data center growth must rest with the corporations creating that demand—not seniors, veterans, working families, or small businesses. Georgia Power should not be allowed to earn profits on unnecessary infrastructure while residential customers absorb the losses. My position is clear: If data centers need the power, they must pay for it. If their demand never materializes, Georgia families should not be left holding the bill. That’s accountability, and that’s putting People Before Profits.”
Josh Tolbert (Received on Oct 21)
“Data centers must cover all direct and indirect costs their demand creates, including generation, transmission, substations, and associated natural gas infrastructure and transportation commitments. Contracts should include enforceable minimum payments, meaningful financial security, and termination provisions sufficient to protect existing customers if projects are delayed, use less electricity, or close early.
Construction should proceed in phases tied to credible demand and binding financial commitments. Before approving utility expansion, the PSC should also evaluate customer-supplied generation that can reduce the capacity the utility must build. The primary financial risk of speculative growth should fall on the developers and utility investors whose decisions create that risk. Residential customers should not become the financial backstop for demand that never arrives.”
-
Shelia Edwards
“Georgia families need guaranteed savings, not speculative promises. Georgia Power’s projection that large-load customers will reduce residential bills beginning in 2029 must be independently verified, not simply accepted at face value. Georgians have heard enough promises about future savings while their electricity bills continue to rise. I would require the PSC to conduct independent financial and demand analyses, examine the assumptions behind projected revenues, and establish measurable benchmarks to track whether those savings actually reach residential customers. The company should be required to provide regular public reports comparing projected revenues, actual collections, infrastructure costs, and the impact on residential bills. If those projections fail to materialize, residential customers should not be forced to cover the difference. Large-load contracts must include enforceable financial guarantees, minimum payment requirements, and other protections that place the financial risk on the corporations creating the demand—not Georgia families. I would also require that verified net revenues benefiting residential customers be reflected in actual rates or bill credits, rather than simply used to justify future spending. My position is simple: Georgia Power must prove the savings, deliver the savings, and be held accountable if its projections fall short. The PSC’s responsibility is not to protect Georgia Power’s profit projections. It is to protect the people of Georgia.”
Josh Tolbert (Received on Oct 21)
“The PSC should require an independently reviewable analysis showing how projected revenue compares with all associated costs, including construction, financing, fuel, operations, and supporting infrastructure. That analysis should test scenarios involving delayed projects, lower demand, higher costs, and early closures.
The Commission should then require regular public reporting comparing actual results with those projections and showing whether savings reach customers’ bills.
If projections fail, the response should follow enforceable protections established before approval: collecting contractual payments, drawing on financial security where appropriate, and reconsidering construction that is no longer justified. The PSC should scrutinize any attempt to recover resulting losses from residential customers. Promised future savings must be supported by evidence and enforceable commitments.”
-
Shelia Edwards
“Existing customers must come first. Reliability cannot be sacrificed to accommodate data centers and other large corporate customers. I believe the PSC must require Georgia Power to demonstrate that serving massive new electricity loads will not compromise service reliability, grid stability, or storm restoration times for existing customers, particularly in rural and historically underserved communities. Before approving major new loads, I would require independent reliability assessments, enforceable performance standards, and infrastructure plans that account for the needs of existing customers. Georgia Power must also demonstrate that it has sufficient generation, transmission capacity, maintenance resources, and emergency response personnel to serve everyone reliably. Rural Georgians should not be left waiting longer for power restoration because utility resources have been redirected to serve multibillion-dollar data centers. I would push for transparent reporting of outage frequency, duration, and restoration times by geographic area, along with accountability when performance standards are not met. Large-load customers should also pay their fair share of the grid upgrades and additional capacity required to serve them. My position is simple: Economic development should strengthen Georgia’s electric grid, not weaken reliability for the families and communities already depending on it. No Georgian should be pushed to the back of the line so a data center can move to the front. People Before Profits.”
Josh Tolbert (Received on Oct 21)
“The PSC should require studies of both statewide capacity and the local transmission and distribution systems affected by each major new customer. Having enough generation statewide does not establish that a particular community can reliably accommodate a large new load.
Necessary upgrades should be completed before service expands, with costs assigned to the customers creating the need. Reviews should also examine backup-power arrangements, emergency operating procedures, and whether growth will strain maintenance crews, equipment inventories, or storm-response resources.
I would require reliability and restoration reporting that identifies rural service problems rather than hiding them within statewide averages. Restoration priorities should reflect safety and community needs. Large customers should finance the infrastructure and resources their growth requires while existing communities receive dependable service.”
-
Shelia Edwards
“Georgia’s energy future must be affordable, reliable, environmentally responsible, and fair to the communities bearing the greatest burden. I believe the PSC must evaluate new power plants based on their full costs and long-term consequences, not simply Georgia Power’s preferred solution. That means examining construction costs, fuel price volatility, reliability, environmental impacts, and the financial risks passed on to ratepayers. When considering projects like the proposed gas-fired units at Plant McIntosh in Effingham County, I would require independent analysis comparing new gas generation with alternatives such as solar, battery storage, energy efficiency, and demand management. We must determine whether additional generation is truly needed and whether less expensive, cleaner alternatives can meet that need reliably. Community impacts must carry significant weight in these decisions. Too often, rural, Black, low-income, and historically underserved communities bear the environmental and health burdens of energy infrastructure while receiving few of the economic benefits. Residents deserve meaningful opportunities to participate before decisions are made, not after projects are approved. I would also examine air pollution, water use, greenhouse gas emissions, and the long-term financial risks of building fossil fuel infrastructure that customers may be paying for decades from now. Reliability is nonnegotiable, but it should never be used as a blank check for unnecessary spending or environmental harm. My responsibility as a commissioner would be to ask three fundamental questions: Is this investment necessary? Is it the most affordable and responsible option? And who ultimately pays the price? Georgia can build a reliable energy future without sacrificing affordability, public health, or the well-being of our communities. That’s what putting People Before Profits means.”
Josh Tolbert (Received on Oct 21)
“For proposals such as the gas-fired units at Plant McIntosh, I would begin by examining whether the capacity is needed, who creates that need, and which alternatives can meet it reliably at the lowest total cost.
That comparison must include construction, financing, fuel, pipeline capacity, operations, environmental compliance, and the risk that forecast demand does not materialize. Alternatives should include upgrades to existing plants, competitive power purchases, customer-supplied generation, and other resources capable of meeting the same reliability requirements.
Environmental and community impacts—including emissions, water use, noise, and infrastructure burdens—deserve measurable analysis and meaningful public participation. My goal is the lowest-emission option that meets affordability and reliability requirements, with appropriate mitigation and fair cost allocation. A project should earn approval through evidence.”
-
Shelia Edwards
“Data centers have demonstrated that they can bring investment to Georgia, but they have not demonstrated that their massive electricity demands will translate into lower monthly bills for Georgia families. Georgia Power is promising future savings but promises are not proof. Before we commit billions of dollars to new power plants and transmission infrastructure, we need independent verification of the costs, benefits, and risks. As a Public Service Commissioner, I will demand evidence that data centers are paying their full share and that residential customers are receiving measurable benefits. Georgia families should not be asked to finance the infrastructure for billion-dollar corporations based on projected benefits that may never materialize. My standard is simple: Show me the savings. Show me who pays. And show me who is accountable if those promises fall short. That position recognizes the potential benefits without dismissing them, while making independent verification and consumer protection the central responsibilities of the PSC.”
Josh Tolbert (Received on Oct 21)
“Large data centers can potentially reduce electricity costs for existing customers by contributing toward shared system costs and financing infrastructure improvements. Their demand may also support investment in more efficient generation. Those benefits must be demonstrated after accounting for every associated expense and financial risk.
My standard is that data centers pay their full direct and indirect costs and provide a measurable financial benefit to existing ratepayers. Contracts must protect customers against delays, lower-than-promised demand, and early closures.
Whether a data center belongs in a community should remain a local decision through a transparent process. The PSC’s responsibility is to ensure that providing utility service protects existing customers, maintains reliability, and delivers the benefits used to justify approval.”
-
helia Edwards
“Once I am elected, I would push for a mandatory public review and recorded Commission vote on all major large-load contracts before they take effect. These reviews must include independent cost assessments, full transparency, and enforceable financial guarantees ensuring that data centers and other large customers pay for the infrastructure required to serve them. Georgia families should never be forced to subsidize multibillion-dollar corporations or bear the financial risk if projected electricity demand fails to materialize. The PSC must stop rubber-stamping major utility decisions and restore accountability to the people it was elected to serve. People Before Profits.”
Josh Tolbert (Received on Oct 21)
“I would propose requiring a public commission vote on major large-load contracts, supported by a written analysis of their full costs, financial risks, reliability impacts, and protections for existing customers.
Before voting for approval, I would require evidence that enforceable customer commitments and financial security adequately address delays, reduced demand, and early termination. The analysis should also examine whether customer-supplied generation could reduce utility construction and demonstrate how any projected savings would reach existing customers.
This would make commissioners directly accountable for the decision and give the public a clear record of its justification. My engineering background would help me challenge unsupported assumptions and evaluate whether the proposed protections actually work.”